
Construction Services
Construction Site Stormwater Services
In August of 2003 , the Environmental Protection Division passed the revised General Permit for Stormwater Discharges from Construction Sites (GAR 100001, GAR 100002, GAR 100003). The law requires that the construction industry:
- provide an Erosion, Sedimentation and Pollution Control Plan
- perform regular inspections of erosion & sediment control devices
- collect daily rainfall data
- perform monitoring of stormwater runoff at all sites over one acre.
GEC has been an industry leader in the performance of these services. We were one of the first consultants approved to perform these services on Georgia Department of Transportation (GaDOT) projects. We can provide many levels of service from project consulting to stormwater monitoring, sampling, and inspections.
We can custom design and implement a stormwater management system design to meed a partlcular projects needs. Our services can include:
- NPDES Presentations and Seminars
- NPDES Project Consultations
- Preparation of Notice of Intent (NOI)
- BMP Installation Oversight or Inspection
- Compliance Inspections
- Stormwater sampling and turbidity analysis
- Submittal of Sampling Reports to EPD
- Preparation of Notice of Termination (NOT)
- Litigation Support
Contact GEC today for help managing stormwater at your construction project.


