The Best Buy project consisted of the fast-track construction of a 700,000-ft2 distribution center on roughly 100 acres of undeveloped land in Dublin, Georgia. GEC provided construction quality control services to Best Buy on the project. GEC engineers recommended the installation of a successful french drain system that greatly enhanced the quality and speed of construction on this project. GEC also worked with the grading contractor in the blending of high plasticity and sandy soils to lower the plasticity. This significantly reduced the amount of undercutting and soil wasting necessary. Because this was a fast-track project, GEC technicians were onsite nearly around the clock to provide testing services. The project was completed in less than 12 months.